Standard Installation excluding high water table areas and Bio-Pure 6-10

Installing the Bio-Pure is quick and easy.  This can be self installed and we offer free telephone support.  If preferred, we offer a full installation service. Please fill out the quotation form if you would like a quote for supply and installation.

Installation Diagram (the illustrations below are a representation of a standard small treatment system)

1

1_install

1) The Bio-Pure should be at least 7m from a dwelling and not too close to trees, because of the roots.

2

install

2) Excavate a hole 2.25m deep by 1.85 m wide using a digger. Ensure the hole is narrower at the bottom.

3

3_install

3) Lower the Bio-Pure into the ground using the digger.  Install anchoring kit now, if required.

4

4_install

4) Dig the appropriate depth hole for the inlet invert and make the connection. Ensure the unit is level.

5

5_install

5) Backfill the unit to approx. 700mm, using pea gravel. Partly fill the unit with water.

6

6_install

6) Make the outlet connection (via sample chamber if necessary). Complete backfill and filling with water.

7

7_install

7) Make the electrical connection from an RCD and use a double outside socket.

8

8_install

8) Sit back and relax!

Click here to view the full installation instructions

If you are in a high water table area please see the following link